Joachim Kueter 7f407a1183 FIX #36866 Project/Time Spent: changing a lined of consumed time does not store changed task assignment (#36867)
On the tab Project/Time Spent there is a list of consumed time, spent on the tasks of the project. Each line is showing a pencil icon to allow a modification of the data.

In edit mode, the assigned task can get changed to a different task of the project. Upon saving the edits, this change is getting ignored, the old task is still assigned:

We need to update the fk_element referencing the task, but we also need to adjust the values for duration_effective of both affected tasks (old and new).